Scaffold prof. METAL 8 Mt 8.30 h. Working
Scaffolding Mod. Metal 8 Cod.M8750 / M8750HD
Galvanized scaffolding Metal 8 working height Mt. 8.30 base dimensions mt. 2.60 x 1.14
Choose the version from the menu: Composition
Standard: Code M8750 only structure to add the desired accessories from the appropriate section at the bottom Accessories
Complete: Cod. M8750HD complete structure with all accessories as per UNI EN 1004 standard
Complete plan for scaffold prof. M8 | +€381.00 |
Complete toeboard for scaffold M8 | +€263.00 |
Fixed half floor for M8 scaffolding | +€189.00 |
PROFESSIONAL METAL 8 scaffolding highly robust large and stable all qualities that make the Metal 8 scaffolding a scaffolding that can always be counted for the renovation of facades or where great productivity is needed thanks to the 260x114 cm base. and with a water-repellent non-slip worktop with dimensions of 250x96 cm. The mobile scaffolding or scaffolding is entirely made of galvanized iron with silver color steps and horizontals in tubular 40x15x1.5 mm with uprights of 40x1.5 and inserts of the horizontal ones from 48x3 and galvanized iron diagonals of 20x1.5. The risers or spans are from mt. 1.20 therefore simpler and easier to assemble and the horizontal ones are double and greatly strengthened the structure instead of single as in common scaffolding.
Elements compositions:
- Base m.2,60x1,14: The base is made up of 4 swivel wheels with 200Ø brake driven on a square structure + 2 horizontal connection.
- Riser / span: the risers are made up of 2 shoulders + 2 horizontal beams and 4 diagonal braces.
- Terminal: the parapet is made up of 2 lateral shoulders + 2 horizontal terminals and 4 diagonal braces.
Characteristics and dimensions
Maximum work height | Structure height |
Maximum height to the floor |
Dimensions ing.base |
Weight kg. |
8,30 mt | 7,50 mt. | 6,35 mt. | 260x114 | 225 |
Standard scaffolding composition (only structure)
Base | Riser/Span h 1.20 mt |
Parapet term. h 1 mt |
Stabilizing auction |
Pc. 1 | Pc. 5 | Pc. 1 | Pc. 4 |
Accessories supplied only in the complete composition UNI EN 1004
Complete plans | Starting plan |
Toeboard |
Floor protection kit | Scale reg. | Scale fixed |
Pc. 2 | Pc. 1 | Pc. 1 | Pc. 1 | Pc. 1 | Pc. 1 |
IT IS POSSIBLE TO ADD OTHER ACCESSORIES ON THE RIGHT OF THE SCREEN
IMPORTANT DETAILS SCAFFOLD METAL 8
Anti-crushing wheels
The METAL8 scaffolding is supplied with 4 swivel castors with a Ø 200 mm high-capacity brake in nylon and neoprene protection. The wheels with these characteristics allow to avoid the crushing of the normal rubber wheels when subjected to not indifferent loads, in addition the neoprene coating protects precious floors from scratches or stains that the normal rubber wheels release. |
|
Fully removable base
The base of the Metal 8 scaffolding can be quickly assembled from 4 pieces in a single piece, this allows for simple and space-saving transport and storage. The base was built to give maximum stability to the scaffold and has a double protection against wear as it is first galvanized and then painted with epoxy powders. |
|
Horizontal double bar
The METAL6 / 8 scaffolding are built with maximum stability and safety in mind, for this reason they have double horizontal bars connected in turn. Sturdiness is one of the main points of the Professional Metal6 and Metal8 scaffolding to work comfortably and safely even at height |
|
Reference Regulations
The Scaffolding Metal 8 has two standards as reference both in force in the Italian territory, the DLG 81/2008 and refers to the indications of the scope of the European Standard UNI EN 1004. To view the composition according to the legislation just view the table below " compositions, while for the total cost of the scaffolding just select the top curtain "compositions" |
|
Work surface anti slip
The worktop is built with a galvanized iron frame and the top is in non-slip treated wood, the car play multilayer wood is treated to withstand bad weather (water, humidity etc.). The top is extremely light and facilitates assembly and disassembly of the scaffolding |
|
Security lock
All the Worktops of professional scaffolding are equipped with an anti-wind safety hook.Once the worktop is positioned at the desired height, simply lower the hook with a rapid movement to secure the worktop from any accidental release. |
|
Stabilizing Rods Collar
The stabilizing rods are locked by means of a double joint with fast coupling / release, this allows total blocking of the element and consequently extreme stability to the scaffold. To move the scaffolding, just release the joint slightly and lift the rod. |
|
Quick coupling pin
The lifting of the risers takes place through diagonals, which are hooked by means of the pin with cascade lever, this system allows the scaffolding to be assembled / disassembled in a very short time and in an extremely easy way. The cascade lever allows a secure coupling of the diagonals. |
|
Lame for overhangs and stairs
The lame can be adjusted every 20 cm and has a minimum overhang of 20 cm and a maximum of 120 cm. this allows the scaffolding to be positioned on stairs, overhangs, etc. The lame can be mounted on the scaffolding on both the short and long sides. Predisposition for mounting the wheels. |
Guidance and implementation to UNI EN 1004 E Legislative Decree 81
Data sheet
- ALTEZZA LAVORO
- da 8 a 9 mt
- MATERIALE
- Ferro zincato
- INGOMBRO BASAMENTO
- 250x110 cm
- Modello
- Metal 8
Specific References
- EAN13
- 698142509439