Semi-professional scaffolding spare parts
In this section you will find all the spare parts referring to semi-professional scaffolding such as rubbers, caps, wheels, various components etc. The category is constantly increasing with articles to serve you an excellent after-sales service for our scaffolding.
Protective nylon fork for stabilizing rod for Pinna, Pinna Clic, Pinna Clic Clac models
Blue threaded knob diameter 8x40 mm CF. 4 PCS.
Knob for professional and semi-professional scaffolding machines in galvanized iron
Spare hook in cast aluminum for the worktop supplied with the Pinna, Pinna clic, Pinna clic clac models
125 mm rubber wheel with galvanized fixed plate
Max capacity 100 kg.
Horizontal Allumet complete with clamps.
Replacement or in addition to the composition of the ALLUMET scaffolding.
Allumet diagonal complete with clamps.
Replacement or in addition to the composition of the ALLUMET scaffolding.
Horizontal conjunction for scaffolds Facal models:
Pinna, Pinna click, Pinna clic clac
Add to cart to know the shipping costs
DIAGONAL FOR ALUMITO SCAFFOLDING
Diagonal of 2100 mm for raising of alumito scaffolding. Marked with N.5
Price Each
Swivel wheel with 150 mm brake
Wheel with galvanized plate support for scaffolding MOD. Metal 7 or others
REPLACEMENT SQUARE ROD FOR BASES SCAFFOLDING MODEL MAXI TRIS PLUS
VAD. PRICE ONE
Horizontal conjunction for aluminum scaffolding Model ALTO Facal
The horizontal bars are exclusively suitable for the ALTO Facal scaffolding model
THE PRICE IS REFERRED ONLY TO 1 PC
Replacement aluminum stabilizer bar for Pinna Clic and Clac scaffolding
Horizontal of conjunction Alumito and Alumito maxi
The horizontal is applied as a conjunction with another upper shoulder and is only indicated for the alumito or alumitomaxi scaffolding of the Facal scale
Spare shoulder with 6 steps
The shoulders are applied as a spare part to the second span of the scaffold "Pinna Clic or Pinna Clic Clac DO NOT APPLY AS EXTENSION
Attention: the cost refers to 1 shoulder and are complete with spring tie rods for the connection with the base shoulders
Basic shoulder with 6 steps Clic and Clac
The shoulders are applied as a spare part to the Pinna Clic Clac scaffolding or as a base shoulder
Aluminum shoulder with 7 steps Pcs 1
The shoulder is applied as a spare part to the click-clack scaffold or to extensions of the click scaffold.
The shoulders are complete with grafts and tie rods
The company does not recommend extension shoulders on a click-clack scaffolding that already has shoulders
Shoulder with 7 steps for scaffolding model ALTO FACAL component shoulder module 2.