Left Banner

  • maxi tris
Trabattello Full altezza di lavoro a metr 8.20 completo di pedana

Full working height scaffolding at 8.20 meters complete with platform

SF720AP
New

Scaffolding Model Full working height 8.20m including the operator the scaffolding will be supplied as per the composition below with a worktop with trapdoor 4 stabilizer rods and a 100 CM terminal parapet that protects the operator.

check In Stock
Hurry! only 9950 items left in stock.
€1,034.55
€1,089.00
Save 5%
Tax included
Quantity

floor with trapdoor.jpg

WORK PLATFORM WITH HATCH

SUPPLIED!

The work platform with trapdoor fixed to the Full scaffolding is built with a galvanized iron frame and a fire-resistant wooden support base. In addition to preventing accidents, the work surface does not deteriorate in contact with water or atmospheric agents such as rain humidity, etc....The top is attached to the scaffolding by means of hooks which increase stability

pin-description-1.jpg

QUICK COUPLING PIN

SUPPLIED

The risers of the Full scaffolding are blocked by means of diagonals, the locking / unlocking of these takes place quickly using the pin with cascade lever, this system allows the assembly / disassembly of the scaffolding in a short time and in an extremely easy way. The cascade lever allows a secure hooking of the diagonals.
echo-leveler.jpg

SCREW LEVELER

NOT SUPPLIED

4 screw levelers can be added to the full scaffolding, which can be adjusted horizontally and vertically. Thanks to this accessory, the scaffolding can be installed on uneven ground and floor and adjusted horizontally in addition to its greater stability. The maximum vertical overhang between the platform and the surface of the wheels is 12 cm.

HALF FIXED WORKTABLE

SUPPLIED

If you need to climb tools or heavy machines (air conditioners, etc.) onto the scaffolding, the half worktop without trapdoor and in non-slip wood could be very useful, to be positioned in the intermediate position of the scaffolding to facilitate the ascent of heavy tools or machines .

d379866cf649ab7d281382644c2839304bfda8af

ADJUSTABLE STABILIZER ROD 200/300 CM

SUPPLIED

You will find the 200 cm telescopic stabilizing rods supplied with the possibility of extending them up to 300 cm which are mounted using quick hooks to the scaffolding columns, the rods shore up the scaffolding during the work and guarantee almost total stability. To move the scaffolding, just unlock the knob and lift the stabilizer rod.

LAME FOR STAIRS

NOT SUPPLIED

Se si devono svolgere lavori in altezza su scale, piani rialzati o piani inclinati indispensabili sono gli zoppi con uno sbalzo regolabile ogni 17 cm fino a 90 cm permettono di svolgere il lavoro in tutta sicurezza. Lo zoppo viene bloccato con pomello alla base e giunto rapido al piantone per dare il massimo della stabilità.

Dimensioni
Altezza d'ingombro 7,25 mt
Altezza max di lavoro 8,20 mt
Altezza al piano 6,25 mt
Larghezza di base 1,60 mt
Lunghezza di base 0,84 mt
Peso  135 Kg
Composizione
Base pz 1
Alzata da 150 cm (2 scalette, 4 diagonali, 2 correnti) pz 4
Terminale Parapetto pz 1
Mezzo piano pz 1
Aste stabilizzatrici telescopiche da 200 a  300 cm pz 4
Piano di lavoro con botola
Pz 1
Ruote girevoli con freno N° 2 Ø 125
Ruote fisse N° 2 Ø 125

 

Normative
Conformità D.lgs.81/08  
Conformità D.lgs. 626/94  
Portata piano 150 Kg  
: SF720AP
Hurry! only 9950 items left in stock.
New

Data sheet

ALTEZZA LAVORO
da 7 a 8 mt
MATERIALE
Ferro zincato
Utilizzo
Semi professionale
Normative
Francese NF E 85-200
Italiana D.Lgs 81/08
Modello
Full

Specific References

EAN13
0698142530624

You might also like