Left Banner

  • maxi tris

Scaffold prof. METAL 8 Mt 9.50 h. Working

M8870
New

Scaffolding Mod. Metal 8 Cod.M8870 / M8870HD

Professional galvanized scaffolding Metal 8 working height 9.50 m, base overall dimensions mt. 2.60 x 1.14

Choose the version from the menu: Composition

Standard: Code M8870 only structure to add the desired accessories from the appropriate section at the bottom Accessories

Complete: Cod. M8870HD complete structure with all accessories as per UNI EN 1004 standard

Composizione : Standard (solo struttura)
Hurry! only 998 items left in stock.
€2,375.00
Tax included
Quantity

Disponibile

TRABATTELLO METAL 8

TRABATTELLI A NORMA EUROPEEA

METAL 8: Designed to cope with monumental and civil restructuring works but also used in general plant engineering. The metal scaffolding 8 Composed of a completely removable base and spans or risers with a height of 120 cm + the terminal railing that delimits the operator's protection.

Components composition:

  • Base m.2,60x1,14: The base is made up of 4 swivel wheels with 200Ø brake driven on a square structure + 2 horizontal connection.
  •  Riser 1.20 m / span from 1.20 m : the risers consist of 2 shoulders + 2 horizontal beams and 4 diagonal bracing.
  • Terminal: the parapet is made up of 2 lateral shoulders + 2 horizontal terminals and 4 diagonal braces.

Characteristics and dimensions

Maximum work height  Structure height 

Maximum height to the floor 

Dimensions ing.base

Weight

kg.

9,50 mt 8,70 mt. 7,55 mt. 260x114 250 

 Standard scaffolding composition D.l.g.s.81 / 08 (only structure)

Base Riser/Span h 1.20 mt

Parapet term. h 1 mt

Stabilizing auction 

Pc. 1 Pc. 6 Pc. 1 Pc. 4

Accessories supplied only in the composition UNI EN 1004

Complete plans      Starting plan 

Toeboard

Floor protection kit  Scale reg. Scale fixed       
Pc. 3 Pc. 1 Pc. 1 Pc.1 Pc.1 Pc 2

IT IS POSSIBLE TO ADD OTHER ACCESSORIES ON THE RIGHT OF THE SCREEN

IMPORTANT DETAILS SCAFFOLD METAL 8

                                                                                                                                                                                                                                                                                                                                  

Anti-crushing wheels

The METAL8 scaffolding is supplied with 4 swivel castors with a Ø 200 mm high-capacity brake in nylon and neoprene protection. The wheels with these characteristics allow to avoid the crushing of the normal rubber wheels when subjected to not indifferent loads, in addition the neoprene coating protects precious floors from scratches or stains that normal rubber wheels release on whole floors.

Fully removable base

The base of the Metal 8 scaffolding can be quickly assembled from 4 pieces in a single piece, this allows a simple and space-saving transport and storage. The base was built to give maximum stability to the scaffold and has a double protection against wear as it is first galvanized and then painted with epoxy powders.

DOPPIA BARRA ORIZZONTALE

Horizontal double bar

The METAL6 / 8 scaffolding are built with maximum stability and safety in mind, for this reason they have double horizontal bars connected in turn to each other. Strength is one of the main points of the Professional Metal6 and Metal8 scaffolding to work comfortably and safely even at height


normative trabattelli

Reference Regulations

The Scaffolding Metal 8 has as reference two standards both in force in the Italian territory, the DLG 81/2008 and refers to the indications of the scope of the European Standard UNI EN 1004. To view the composition according to the legislation just view the table below " compositions, while for the total cost of the scaffolding just select the top curtain "compositions"

PIANO DI LAVORO ANTISCIVOLO IDROREPELLENTE

Work surface anti slip

The worktop is built with a galvanized iron frame and the top is in non-slip treated wood, the car play multilayer wood is treated to withstand bad weather (water, humidity etc.). The top is extremely light and facilitates assembly and disassembly of the scaffolding.

GANCIO ANTIVENTO PER PIANI LAVORO

Security lock

All the Worktops of professional scaffolding are equipped with an anti-wind safety hook.Once the worktop is positioned at the desired height, simply lower the hook with a rapid movement to secure the worktop from any accidental release.

Stabilizing Rods Collar

The stabilizing rods are blocked by means of a double joint with fast coupling / release, this allows total blocking of the element and consequently extreme stability to the scaffold. To move the scaffolding, just release the joint slightly and lift the rod.

NOTTOLINO DI BLOCCAGGIO DIAGONALI

Quick coupling pin

The lifting of the risers takes place through diagonals, which are hooked by means of the pin with cascade lever, this system allows the scaffolding to be assembled / disassembled in a very short time and in an extremely easy way. The cascade lever allows a secure coupling of the diagonals.

ACCESSORIO ZOPPO PER SCALE

Lame for overhangs and stairs

The lame can be adjusted every 20 cm and has a minimum overhang of 20 cm and a maximum of 120 cm. this allows the scaffolding to be positioned on stairs, overhangs etc. The lame can be mounted on the scaffolding both on the short and long sides. Predisposition for mounting the wheels.

Guidance and implementation to UNI EN 1004 E Legislative Decree 81

CHIAMACI TRABATTELLI PONTEGGI

: M8870
Hurry! only 998 items left in stock.
New

Data sheet

ALTEZZA LAVORO
da 9 a 10 mt
MATERIALE
Ferro zincato
INGOMBRO BASAMENTO
250x110 cm
Modello
Metal 8

Specific References

EAN13
698142206659

13 other products in the same category:

   

You might also like